How a project unfolds,
step by step

Whether you are renovating an apartment, transforming a house or building new, a well-run project follows a clear sequence. In Switzerland this sequence is standardised: each stage has a defined scope, produces specific deliverables and ends with a decision point for you as the client. You always know what has been agreed, what it will cost and what comes next, from the initial brief through to handover.

Let's talk about your project
01
The phases

From first idea to handover

Phases 1–2

Objectives and feasibility

We start by understanding how you want to live or work, your budget and your timeframe, and we review the planning constraints of the site or building: zoning, regulations and development potential. We then test different options to confirm the project is feasible. Deliverables: client brief, feasibility study, initial cost range.

Phase 31

Preliminary design

Your project takes shape: layout, massing, natural light, first choices of materials and structure, and energy performance targets. This is when you see your future space for the first time, and when changes cost the least. Deliverables: concept drawings, cost estimate (±15%), outline programme.

Phase 32

Design development

We refine the design with the structural and building services engineers: technical coordination, construction details, and selection of materials and finishes. Deliverables: developed design drawings, detail studies, detailed cost estimate (±10%).

Phase 33

Building permit

We prepare and submit the planning application to the Geneva authorities, either a fast-track (APA) or a full application (DD) depending on the works, and handle all correspondence until the permit is granted. As qualified professionals (MPQ) registered in Geneva, we can sign and submit building permit applications directly. Deliverables: complete application package, follow-up through to approval.

Phase 41

Tendering

We prepare the tender documents and bills of quantities, invite several contractors to price the works, then analyse and negotiate the bids with you. Deliverables: tender analysis, contractor recommendation, updated budget based on actual prices.

Phases 51–53

Construction and handover

We produce the construction drawings, administer the building contracts and supervise the works on site, controlling cost, quality and programme. At completion we organise the handover inspection, follow up any defects and provide the as-built documentation. Deliverables: your finished project, fully documented, and the keys.

02
The framework

A shared Swiss reference

Discover our services

Architects and engineers in Switzerland work to a common framework, defined by the SIA (Swiss Society of Engineers and Architects). For you, it means a transparent process: each stage builds on the previous one, decisions are made in the right order and costs become more accurate as the design progresses. You can pause or adjust the project at the end of any stage, and you only commit to the next one when you are ready.

Rénovation maison, Madrid
03
Costs

Cost accuracy increases at every step

Phase 31

±15%

Preliminary design: an early estimate based on floor areas, volumes and benchmark costs, enough to check that the project fits your budget.

Phase 32

±10%

Design development: a detailed estimate built up element by element from the specification of works.

Phase 41

Real prices

Tendering: costs are confirmed by the contractors' bids before any work starts, then closed out in the final account.

04
Your mandate
Vue aérienne de Genève avec la cathédrale Saint-Pierre – Cabinet d'architectes CM Studio

A mandate tailored to your project

Not every project needs every stage. You can appoint us for a feasibility study before buying a property, to obtain planning permission only, or for the full service through to completion. Once you have moved in, we can also help with maintenance, energy upgrades or future alterations. We agree the scope with you at the outset, so you know exactly what is included.

Contact us
05
Deliverables

What you receive at each stage

At the end of each stage you receive clear documents to keep, and you decide whether and how to move forward.

Phases 1–2 · Feasibility

Client brief, budget and outline timeframe; feasibility study comparing options; list of consultants required (structural engineer, building services, acoustics, etc.); initial cost range and fee proposal.

Phases 31–32 · Design

Concept drawings (site plan, floor plans, sections, massing), outline specification of materials and structure, energy targets and cost estimate (±15%); then developed design drawings coordinated with the engineers, detail studies and detailed cost estimate (±10%).

Phase 33 · Building permit

Planning drawings (plans, sections, elevations) at the scale required by the authorities, forms and supporting technical documents, and a full application (APA or DD) submitted and managed through to the decision.

Phase 41 · Tendering

Tender drawings, specifications and bills of quantities, bid comparison table, contractor recommendation, revised budget and programme.

Phases 51–53 · Construction

Construction drawings and details, building contracts, construction programme, site supervision with cost and quality control, handover reports, as-built documentation, defects follow-up during the two-year warranty period, and final account.

06
FAQs

Frequently asked questions

When should I hire an architect for my project?

Ideally before you commit: before buying a property, or as soon as you start thinking about works. Early advice helps you avoid costly surprises, check what is allowed and set a realistic budget.

How long does a renovation project take in Geneva?

It depends on the scale of the works. Design usually takes a few weeks to a few months, followed by the building permit procedure, which in Geneva can take several months, before construction starts. We give you a realistic schedule from the very first meeting.

How long does it take to get a building permit in Geneva?

A fast-track application (APA) for smaller works is generally processed faster than a full application (DD), which is required for larger projects, new builds or extensions and can take several months. A complete, well-prepared application is the best way to avoid delays.

How much does an architect cost in Switzerland?

Fees depend on the size and complexity of the project and on the stages you entrust to us. After a first meeting, we send you a detailed fee proposal broken down by stage, so you know the cost upfront.

Do I need a building permit for my renovation?

In Geneva, many works require a permit: changes to the facade or windows, structural work, extensions, changes of use and some interior alterations. Minor works may be exempt. We check this with you at the very start of the project.

Who can submit a building permit application in Geneva?

In Geneva, the plans and documents of a building permit application must, in most cases, be drawn up and signed by a qualified professional registered with the canton (MPQ). As architects SIA, registered REG A and MPQ in Geneva, we can sign and submit your application directly and follow it through to the decision.

Can I hire an architect for only part of the project?

Yes. You can appoint us for a feasibility study, for the permit application only, or for the full project through to completion. Each stage ends with a decision, so you remain free to continue, adjust or pause.